Trades β Plumbing & HVAC installers
From the boiler to the drinking-water regulation β one question, one source.
Manufacturer documentation, maintenance contracts, regulations: CuraLogik answers your technicians' questions on the road β and preserves experienced colleagues' knowledge before they retire.
HOW YOUR TEAM ASKS β HOW CURALOGIK ANSWERS
What maintenance intervals does the manufacturer require for the boiler?
Annual maintenance with burner cleaning and flue-gas measurement; anode check on the tank every two years. Checklist per maintenance manual chapter 8.
Maintenance manual ch. 8
What does the drinking-water regulation require for Legionella testing?
Commercial systems with a large storage tank: sampling every three years by an accredited lab, sampling points per plan; above the action level, notify the health authority.
Work instruction, Legionella testing
How does heat-pump commissioning work?
Leak test, flushing record, hydraulic balancing, customer briefing with sign-off β commissioning protocol IB-12 walks through every step.
Protocol IB-12
Your industry package, included from the start
On top of the eight standard categories, your account starts with industry-specific categories β and, on the Plus plan, the matching industry assistant.
Manufacturer specsRegulations & ordinances
INDUSTRY ASSISTANT (PLUS)
Standards assistant
Searches installation and maintenance manuals, regulations, and internal work instructions β the right spec before the customer starts waiting.
Ready within hours β no installation
One-time setup fee β¬490 Β· Plans from β¬149/month Β· Cancel anytime Β· All prices net